July 27, 2024 – Sod has been laid down and is being watered.

July 21, 2024 – For the Theology Dormitory, the stained glass windows are installed in the Padre Pio Chapel Oratory.

July 7, 2024 – For the Student Life Center, the brickwork on the Refectory porch has been installed, the library shelving has been fully installed, the Humilitas window has been installed in the Refectory, the sanctuary and narthex flooring are being laid, and the Refectory chandeliers and uplighting have been installed.  For the College Dormitory, the stained glass windows have been installed, the sacristy furniture is being installed, and the concrete flooring in the student rooms is finished.  In the Theology Dormitory, the cabinets in the Bishop guest suites are being installed.